Assignment | Section | Problems | Due date | Max points |
1 | 1.1 | 1,2b,2c,3,9,13 | 9/11 (postponed until 9/13) | 10 |
2 | Mathcad Basics | 9/18 | 10 | |
3 | 1.2 | 13 (use both formulas) | 9/18 | 10 |
4 | 1.3 | 6,7 | 9/18 | 10 |
5 | 2.1 | 4 | 9/25 | 10 |
6 | 2.2 | 1,2 | 9/25 | 10 |
7 | 2.3 | 6ab,8(i and ii) ab | 10/2 | 10 |
8 | 2.5 | 2 | 10/9 | 10 |
9 | 3.3 | 1ad,2ad | 10/30 | 10 |
10 | 3.4 | 3ad,4ad | 11/6 | 10 |
11 | 4.1 | 3b,4b,10b | 11/6 | 10 |
12 | 4.2 | 6,8 | 11/13 | 10 |
13 | 4.3 | 1c,2c,3c,4c | 11/13 | 10 |
14 | 4.4 | 1ade,2ade | 11/27 | 10 |
15 | 4.6 | 1bd,2bd - Note: In Problem 2, obtain accuracy 10-5, rather than 10-3 | 11/27 | 10 |